Massive Stormwater Improvements-Komatke
Summer monsoons and winter rain storms have laid waste to some of the private properties along the southern end of the Gila River Indian Community near the Vee Quiva Casino. A long term solution was required which came in the form of multiple, very large retention basins placed around the toe of the hillside. Extensive earthwork along with the construction of 41 cast-in-place, concrete inlet-outlet structures, spillways and a large multi-barrel box culvert.
DBA was responsible for all of the structural concrete work on the project which was recently completed.